Kentucky Mitigation Bank – Franklin County, Kentucky

Steeles Branch Mitigation Bank Franklin County, Kentucky The primary objective of this stream mitigation project is to enhance and then preserve streams that are considered “waters of the U.S.” within the watershed to provide compensatory mitigation credits in advance of authorized impacts in the Commonwealth of Kentucky within the jurisdiction of the Louisville Corps District.

Phase I Archaeological Survey – Roane County, Tennessee

Roane County, Tennessee Prepared by Vincent Versluis and Jesse Robinson From September 21-23, 2021, archaeologist Jesse Robinson of Waypoint, LLC conducted a Phase I archaeological survey of approximately 153 acres (0.24 square miles) for proposed stream restoration project near the city of Rockwood, Roane County, Tennessee. Vincent Versluis served as Principal Investigator; Jesse Robinson served …

Stream Mitigation Bank Fisheries Study

Last month we performed a fisheries study at a stream mitigation bank site. This data is being used to determine the Biotic Integrity Index to help measure the success of the restoration project. Populations of multiple fish species were found in pools just like these throughout the project.

Eelgrass Restoration Monitoring

Eelgrass (Zostera marina) Restoration Monitoring with UAV Eelgrass beds provide food and habitat for blue crabs, young striped bass, bay scallops, waterfowl, and many other aquatic species. The beds also filter pollutants, reduce shoreline erosion, trap sediments, and add oxygen to the water. 2021 Data Acquisition Details The aerial submerged aquatic vegetation (SAV) imagery from …

Macroinvertebrate Survey & Analysis

Benthic Macroinvertebrate Survey & Analysis Benthic macroinvertebrate survey and analysis is provided by our team of aquatic entomologists and biologists. Waypoint’s macroinvertebrate survey team is equipped to take on all of your aquatic survey needs. Our staff is fully permitted and qualified to conduct macroinvertebrate surveys in various states and can analyze your samples if …

Floodplain Permitting

As required by Kentucky Revised Statute 151.250, stream construction permits are required for any development occurring in, along, or across a stream. Typical projects include, but are not limited to, dam construction or maintenance, stream crossing projects (excluding KYTC), residential or commercial development, fill, stream bank stabilization, channel realignment, or impoundments. Contact us today to …

Kentucky Drone Services

Kentucky Drone Services are provided by our FAA certified drone pilots. Our EcoDrones can provide a wide variety of site assessment data including Thermal Imagery, Low Elevation Video Data, Construction Monitoring or Surveillance, Aerial Imagery, Spill Monitoring and Assessment, Legal Exhibits, and a wide variety of other environmental or ecological habitat assessment or other ecological …